Aug 25, 20222 min read

How many estacas helicoidais and how long did it take?

The challenges of the project

The Vistech advantages

"It was a 3 men’s job, and it took 4 full days to build the fundações para the building" shared com us Kevin Musgrove of Postech Moncton. Our Vistech’s equipa used 52 estacas helicoidais of P312L7-12. The estacas helicoidais De Vistech were built to be able to support heavy loads in compression, in traction and laterally. Therefore, the clientes was confident in our product and our execution.

During this project there was a lot of ground water on local. This resulted in very muddy conditions. Piles are a better choice in areas where ground movement is common due to solo liquefaction or groundwater problems.

Structures may be subjected to horizontal forces that affect the fundações. The use of a estacas helicoidais fundações helps to reduce the bending action as well as support the vertical load that comes onto the fundações. As a result, estacas helicoidais fundações were required para the construction of this structures and can be recommended when building structures that are highly susceptible to water effects.

By working com Vistech, você can assegurar that o seu fundações para o seu project is sólido. It doesn’t require any maintenance, is simple to instalar, is rápido and leaves the local clean. A rápido and sustentável way to start building o seu project on sólido fundações.