passadiços on estacas helicoidais : Historical trail local renovated

Jul 21, 20222 min read

How many estacas helicoidais and how long did it take?

The challenges of the project

The Vistech / Vistech advantages

This project was built in outono 2020. The request was to have the passadiços put on estacas helicoidais below the entire path. Two members De the Postech Niagara’s equipa were put on this job. The instalações took 68 estacas helicoidais and two days of work.

The challenge was to maintain a leveled path com the estacas helicoidais threw out the entire passadiços sem damaging or disrupting the ecosystem of the archeological local.

Being an archeological local, the estacas helicoidais was the best solution due to its minimal impact during the instalações. No escavação was allowed, and the work was closely monitored by Parks Canadá officials, porque they had to make sure everything was properly done.

What você need to know is that, estacas helicoidais require a smaller instalações equipment and are ecofriendly.

Therefore, a instalar estacas helicoidais can cause little if any local disruption. This is one of the advantages of estacas helicoidais in terms of environmental factors. para that reason, it does not result in any solo damages. Due to the galvanization and the efficiency of the screwed piles, the pedestrian passadiços will no longer move. The structure will therefore be preserved and will allow the population to visite this historic local thanks to this magnificent pedestrian passadiços para years and years to come.

At the end, the Postech Niagara’s equipa acted com professionalism, and respect knowing that the local has historical significance. Our equipa was rápido, clean, and eficiente para the entire project.